Services

Contracting

  • ACMV
  • Electrical & ELV
  • Fire Fighting
  • Medical Gas
  • Building Management System (BMS)
  • Thermal Energy Storage (TES) Tank
    Thermal Energy Storage (TES) is an Energy Management Technology that has the capability to shift and reduce peak energy demand for Air-Conditioning system without affecting the comfort levels within the building. Thermal energy is stored/charged using the refrigeration equipment during low energy demand hours (Off-Peak periods), and is discharge for usage during high energy demand hours (On-Peak periods). With thermal storage, energy costs are reduced in two ways:
    1. By using cheaper energy tariff for charging and stored the energy for usage during high cost on-peak periods.
    2. By reducing on-peak energy demand by utilizing the stored energy and avoiding high demand charges imposed by utilities.
    Lower off-peak energy costs and lower Maximum demand charges results in significant savings as compared to conventional non-storage systems.
  • Energy Services
    UAT is Energy Services Company (ESCO) registered under Energy Commission. UAT offering energy efficiency services and Energy Performance Contracting (EPC)


Servicing

  • Service & Maintenance
    UAT have the necessary experience and capabilities to provide ACMV related equipments with periodic service and maintenance for ensuring the equipments is functioning as intended .
  • Duct Cleaning
    UAT can provide the services of inside ductwork inspection and Robotic cleaning services to maintain the cleanliness of the cooling space by periodically conducting the duct cleaning process
  • Pipe Flushing
    UAT can provide the Chilled water pipe chemical flushing and corrosion control for the entire piping loop.
  • Pipe Stress Analysis
  • Fluid Dynamic
  • Hydraulic Flow Analysis Stimulation
  • Duct Pressure Test
    UAT has the equipment and capabilities to conduct Duct leakage pressure test for the Duct system to meet SMACNA duct construction standard.
  • Chiller Plant Operation
    UAT has the knowledge and manpower to Operate the Chiller plant Equipments to meet the Building cooling demands and optimising the system performance


Audit Consultation

  • Energy Audit
  • GBI Consultation.
  • CFD Simulation
  • Building T&C
    UAT has the capability and knowhow to conduct Building Audit and Testing and commissioning for Air side balancing, chilled water distributions and Smoke spill system.
  • Bio Gas
  • Instrumentation
    UAT has the latest and up to date instrumentations for the ACMV related Scope of work
  • VIPCODA
    Electrical System Design


Hospital OT Turnkey Contractor

UAT is specialising in Turnkey job involving the Hospital renovation and upgrading works involving ACMV, Electrical, Fire protection system, medical gas requirements and Civil and Structure and ID finishing.